Day 2 of setting construction
Posted by Sam25 | |
After the second day of construction, the town scenery is coming along smoothly. All of the building have been cut out, and after sticking on model slabs for a brick effect on some of the buildings and extending the front of the shop, the base coat has been painted on all of the scenery. We used more light wood to create the frames for the windows and the panels of the door. For the side of the building we found some tiled effect wood in a DIY store and applied it to the orphanage to give the brick effect. Here are some more pictures to show our progress.
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment